Substation at Hamranes
CategoryOlder Projects
Investor Name:
Published Date:
January 1, 1970
Location:
Value:
Architecture:
Protocol
The project, substation at Hamranes, involves in the construction and building walls of precasted units as well as a steel construction to block off the voltage by the substation Hamranes. ÍSTAK’s mechanical engineering facility handles all steel contruction work and the concrete constructions will be casted in ÍSTAK’s Casthouse at Tungumelar.
Key figures:
- Precasted wall units 310 m2
- Steel structure 6500 kg
- Mineral wool wall insulation 500 m2
Buyer:
Period:
- December 2015 – March 2016
Developers:
ÍSTAK’S Role:
- Main contractor